Svartsengi Geothermal power plant monitored by P-CIM is one of the largest SCADA systems in Iceland. Located in Iceland’s Reykanjes peninsula, the plant is built on a lava field dating from a volcanic eruption that took place in 1226. Svartsengi generates energy that provides heated water throughout the southwest peninsula. Geothermal brine that is not used for heating forms the Blue Lagoon, a popular tourists spa. P-CIM monitors 50 substations which include: - Seven hot water heat exchangers producing hot water with over 150MW of thermal energy
- 11 turbines/generators producing 50 MW of electricity
- Hot water distribution systems
- Cold water distribution systems
- Electricity distribution system
|